Applications for Non-PURPA QF interconnections are processed on a first-come, first-served basis. 的 应用程序列表 will take you to the Open Access Same-Time Information System (OASIS) site. 来自OASIS站点, 在左侧菜单栏, 点击“发电互连”,,然后是“发电互联队列”.”
高达20兆瓦的发电机
Process for Generators up to 20 Megawatts (MW)
步骤1:
的 互连的应用程序 must be completed and submitted for all generator interconnections to the hg8868皇冠下载 system. Proof of site control and a $1,000 deposit are required.
步骤2:
A 可行性研究协议 includes a general review of system impact, capacity constraints and any potential issues with the customer’s choice of point of interconnection.
步骤3:
A 系统影响研究协议 provides a detailed assessment of transmission system adequacy to accommodate the project. This step may not be necessary for some projects, depending on size and location. 需要1万美元的定金.
步骤4:
A 设施研究协议 includes design and engineering studies to determine design and specifications. 建设 options are provided to the customer. 订金最高可达3万美元.
步骤5:
互联协议. all projects up to 20 megawatts (MW) are subject to technical requirements under the 互联协议 once the project becomes operational.
A Small 发电机并网 Agreement (SGIA) must be filed with the Federal 能源 Regulatory Commission (FERC) for all projects up to 20 MW selling energy off-system.
大于20兆瓦的发电机
重要的是: 10月2日, 2023, hg8868皇冠下载 submitted its required Compliance Filing with FERC Order 2023 (ER24-10-000), which modifies the Large 发电机并网 Process (LGIP) for non-PURPA projects over 20 MW. 的 requested effective date is January 1, 2024. 合规文件可在以下网站找到 皇冠现金盘公司的OASIS in the Recent Filings subfolder contained in the Tariff folder.
步骤1:
的 Large Generator 互连的应用程序 must be completed and submitted for all generator interconnections greater than 20 MW in the hg8868皇冠下载 system. Proof of site control and a $10,000 deposit are required.
步骤2:
A Large Generator 可行性研究协议 包括对系统影响的一般审查, capacity constraints and any potential issues with the customer’s choice of point of interconnection.
步骤3:
A Large Generator 系统影响研究协议 provides a detailed assessment of transmission system adequacy to accommodate the project. 订金为5万美元.
步骤4:
A Large Generator 设施研究协议 includes design and engineering studies to determine design and specifications. 建设 options are provided to the customer. 订金为10万美元.
步骤5:
A Large 发电机并网 Agreement (LGIA). All projects greater than 20 MW are subject to technical requirements under the 互联协议 once the project becomes operational.
发电机互连触点
发电机并网 — Physical Connection to the Wires
劳拉·纳尔逊
208-388-2658
generatorinterconnection@automotoamericaine.com
QRE服务问题
Aubrae斯隆
208-388-5697
asloan@automotoamericaine.com
For assistance with a PDF on this page or to request a PDF in an alternate format, 请与客户服务部联系 208-388-2323 or 1-800-488-6151